Innogy Stoen Operator has launched the first SN / LV station in Warsaw (Bemowo district) where an additional automatic power maintenance system equipped with supercapacitors has been used. This solution was developed at the Prototype Production Branch in Białystok.
Innogy Stoen Operator has launched the first SN / LV station in Warsaw (Bemowo district) where an additional automatic power maintenance system equipped with supercapacitors has been used. This solution was developed at the Prototype Production Branch in Białystok.The implemented system is to reduce the risk of interruptions in energy supply, and in the event of their occurrence, reduce the time needed to restore power. This is important from the point of view of ensuring reliability and increasing the durability of the station's battery power system. This is especially important for 2 000 energy consumers in the range of the station.
More information on CIRE or here.